Wednesday, 11 November 2026 • Haryana 📱 WhatsApp Channel  |  Weather  |  Contact  |  हिन्दी English
Farmers

Haryana Shrimp Farmers Get Up to Rs 9 Lakh Solar Subsidy: Limit Raised from 10 kW to 30 kW

📌 Key information

  • News: Haryana Shrimp Farmers Get Up to Rs 9 Lakh Solar Subsidy: Limit Raised from 10 kW to 30 kW
  • Date: 11 November 2026, 2:06 AM
  • Author: Harish Sharma
  • Category: Farmers
  • Source: See the official portal for details — the link is inside the story.

Shrimp farmers in Haryana have received major relief. The state government has raised the capacity limit for subsidised solar power systems used in shrimp farming from 10 kilowatts (kW) to 30 kW. Agriculture, Farmers’ Welfare and Fisheries Minister Shyam Singh Rana announced the decision on Tuesday, 10 November 2026. Farmers can now get a 60 per cent subsidy on a solar system of up to 30 kW, which means assistance of up to Rs 9 lakh.

How much subsidy will farmers get

Under the state’s Intensive Fisheries Development Programme 2025-26, the project cost for solar power systems used in white shrimp farming has been fixed at Rs 50,000 per kW. The subsidy is 60 per cent of the approved project cost.

Capacity Project cost 60% subsidy
10 kW Rs 5,00,000 Rs 3,00,000
20 kW Rs 10,00,000 Rs 6,00,000
30 kW Rs 15,00,000 Rs 9,00,000

Earlier, the maximum subsidy was Rs 3 lakh at 10 kW. Now it has risen to Rs 9 lakh — three times more.

Why electricity is the biggest cost in shrimp farming

Shrimp ponds need aeration machines running continuously to keep oxygen levels up in the water. When power fails, farmers have to run diesel generators, which raises costs and puts the shrimp at risk. The minister said solar power will cut both electricity and diesel expenses, making shrimp farming cheaper, cleaner and more profitable.

Integrated aqua parks in Sirsa and Bhiwani

The government is also strengthening fisheries infrastructure. Integrated aqua parks are being developed in Sirsa and Bhiwani districts, which will work as centres of excellence. Construction of the Bhiwani centre has begun and it is expected to become operational by June 2028. In Sirsa, an aqua park is coming up at Poharka village under the Pradhan Mantri Matsya Sampada Yojana (PMMSY).

How to apply

The application process for this solar subsidy has not been officially announced yet. Farmers should watch for announcements from the Haryana Fisheries Department for the application window and the documents required.

Frequently asked questions

What is the maximum solar subsidy for shrimp farmers in Haryana?

Up to Rs 9 lakh — a 60 per cent subsidy on a 30 kW solar system costing Rs 15 lakh.

What was the earlier subsidy limit?

The earlier limit was 10 kW, with maximum assistance of Rs 3 lakh.

What is the project cost fixed per kW?

Rs 50,000 per kW under the Intensive Fisheries Development Programme 2025-26.

When will the Bhiwani aqua park centre open?

Construction has begun and the centre is expected to become operational by June 2028.

Related stories

Sources: The Tribune — https://www.tribuneindia.com/news/haryana/haryana-triples-solar-subsidy-cap-for-shrimp-farmers-boosts-support-for-aquaculture/ ; UNI India — https://www.uniindia.com/north-india/agri-haryana-solar-subsidy-shrimp-farmers/241144

Make Viksit Haryana your preferred news source on Google — our news will reach you first.